FirstHR

Stretch Assignments: Examples and How to Use Them

What a stretch assignment is, 20 examples by skill, how to scope one without causing burnout, and how small businesses use them to develop and keep people.

Nick Anisimov

Nick Anisimov

FirstHR Founder

Training
21 min

Stretch Assignments

How to develop and keep good people using work you already have, at 5 to 50 employees

One of the best employees I ever had told me, in her exit interview, that she had been bored for about eight months. I had no idea. Her work was excellent, she never complained, and I had read all of that as contentment. What it actually was: someone who had stopped growing and had quietly started looking.

The frustrating part is that the work she wanted existed. We had a vendor selection nobody had time for, a process that everyone complained about and nobody owned, and training that lived entirely in two people's heads. Any one of those would have been a genuine challenge for her. I had simply never thought to offer them, because in my head those were my problems and her job was her job.

That is what a stretch assignment is: real work that sits beyond what someone can currently do, given to them on purpose. This guide covers what it means, twenty examples grouped by the skill they build, how to scope one so it develops rather than damages, and how to run the debrief that turns the experience into a capability.

TL;DR
A stretch assignment is real work given to an employee that sits deliberately beyond their current ability, so that completing it builds a capability they did not have. It needs a defined end point, an explicit acknowledgment that it is hard, support that does not become takeover, and something removed from their existing workload. At a small business the raw material is already there.

What Is a Stretch Assignment?

A stretch assignment is a piece of genuine work given to an employee that sits deliberately beyond their current skills or experience, so that completing it builds a capability they did not previously have. The difficulty is not a side effect. It is the mechanism. The capability comes from working through the gap rather than from being taught about it.

Definition
Stretch Assignment
A real, business-relevant project or responsibility assigned to an employee that exceeds their current demonstrated capability, undertaken with the explicit intention of developing a specific skill. It has a defined scope and end point, carries genuine consequences, and includes support and a debrief. Also called a stretch project, particularly when the work is a discrete project rather than an ongoing responsibility.

Three things separate a stretch assignment from ordinary work. It is beyond current capability, so the person will struggle with parts of it. It is real, meaning the business needs the outcome and a poor result would matter. And it is intentional, with someone having decided that this person should develop this capability rather than the work simply landing on whoever was available.

The concept sits at the centre of how professional capability actually develops. The Center for Creative Leadership, whose Lessons of Experience research produced the widely used 70-20-10 framework, places challenging assignments in the largest of the three categories: most professional development comes from demanding work rather than from courses. The specific ratios have never been empirically validated, but the direction is well supported, and the practical implication is clear. If you want someone to grow, the lever is the work, not the training budget. Our 70-20-10 learning model guide covers the framework and its limitations.

Stretch Assignment vs Delegation, Stretch Goals, and Stretch Roles

These four terms get used interchangeably and mean different things. The distinctions matter because each requires a different amount of your time and carries a different risk.

What It IsPerson Can Already Do It?Manager Time
Stretch assignmentReal work beyond current ability, given to build a capabilityNo, and that is the pointGoes up. Support, unblocking, and review are part of the design.
DelegationWork handed to someone who can already do it, to free up the managerYesGoes down. That is usually the objective.
Stretch goalAn ambitious performance target above comfortable achievementYes, at a lower level of outputRoughly unchanged. It is about effort against existing work.
Stretch roleA job someone is promoted into before they are fully readyNot yet, across the whole roleHigh and sustained. This is a much larger commitment than an assignment.
Workload increaseMore of the same workYesUnchanged. This is not development, whatever it is called.

The last row is worth naming directly, because it is the most common substitution. Giving someone twice as much of what they already do is not a stretch assignment, and describing it as one is the fastest way to make the term meaningless inside your company. If the work does not require a capability they lack, it is a workload change.

Why Stretch Assignments Matter More at Small Scale

Large companies have to manufacture developmental experiences. They run rotation programmes, build leadership academies, and construct projects partly so that high-potential people have somewhere to grow. It is deliberate and it is expensive.

A small business has the opposite problem and therefore the opposite opportunity. There is always more work that genuinely needs doing than there are people to do it. The vendor selection nobody has time for, the process everyone complains about, the customer relationship that defaults to the founder, the training that has never been written down. Every one of those is a developmental experience that already exists and is currently unstaffed.

This matters because the alternative development levers at small scale are weak. You cannot offer a promotion track with five defined levels. You often cannot match a larger employer on salary. What you can offer is scope: real responsibility, sooner, on things that matter to the business. That is a genuine competitive advantage in retention and it costs nothing except the discomfort of letting someone else do a thing you would do faster.

What Losing a Bored High Performer Costs
Replacing an employee runs $15,000 to $50,000 once recruiting, training, lost productivity, and replacement are counted (SHRM). The people most likely to leave over lack of growth are the ones you can least afford to lose, and they rarely announce it. Excellent work delivered without complaint is not evidence of engagement.
What worked for me
The shift that changed this for me was giving up a specific piece of work I was good at. I handled all supplier negotiations because I was quick at them. Handing that to someone whose role had nothing to do with procurement felt inefficient, and the first two negotiations went worse than mine would have. The third went better than mine would have, because she had asked questions I had stopped asking years earlier. I had been treating my own speed as a reason to keep the work, which is how founders end up as the bottleneck on everything they are competent at.
Still Using Spreadsheets for Onboarding?
Automate documents, training assignments, task management, and track onboarding progress in real time.
See How It Works

20 Stretch Assignment Examples, Grouped by Skill

These are chosen to be realistic at 5 to 50 employees, which rules out most of what appears in enterprise lists. There is no rotation programme here and no international assignment. Every one of these is work that probably already exists in your business and is currently done by whoever is most senior, or not done at all.

Leadership and influence
Run the weekly team meeting for a quarter, including setting the agenda and following up on actions
Onboard and mentor the next new hire in their function, owning the plan rather than just answering questions
Lead a project that requires two people from different parts of the business to agree on something
Cover the manager's responsibilities during a two-week absence, with a named escalation route
Commercial and customer facing
Own the relationship with three accounts end to end, including the difficult conversations
Run a customer discovery round: ten calls, written findings, a recommendation you act on
Present to a customer or a supplier without you in the room
Prepare and deliver the quarterly numbers for their area to the rest of the team
Process and operations
Take a manual process that annoys everyone and redesign it, with authority to change how it works
Own vendor selection for a tool the team needs, including the evaluation and the recommendation
Document a process only they and one other person understand, well enough that a new hire could follow it
Run the response to something that has gone wrong, with you available but not directing
Judgment and decision making
Own a small budget line and the decisions inside it, including saying no to requests
Make the hiring recommendation for a role in their area, running the interviews themselves
Choose between two options where both are defensible, then write down the reasoning
Sit in on a decision above their level as an observer, then debrief what they would have decided
Communication and teaching
Build and deliver the training for a part of the job they know better than anyone
Write the customer-facing explanation of something technical, and own the revisions
Represent the company at an industry event or a supplier meeting
Run a retrospective after a project and produce the changes the team will actually make

Choose based on the capability you want to build, not on which task you most want off your desk. Those two sometimes coincide and frequently do not. The individual development plan guide covers how to identify which capability matters for a specific person, and cross-training covers the adjacent case where the goal is coverage rather than growth.

Choosing the Right Person

Three factors have to be present together. Missing any one of them turns a development opportunity into a problem.

FactorWhat to Look ForWhat Happens Without It
CapacityThey have room, or you can create room by removing something specificThe assignment gets absorbed into evenings and weekends, and burnout follows
MotivationThey have said they want more scope, or asked what comes nextIt reads as being volunteered for extra work, which produces compliance rather than engagement
A plausible gapBeyond them, but where you would give it roughly even odds of going wellToo small and nothing is learned. Too large and the failure damages confidence rather than building it

The motivation factor is the one founders most often assume rather than check. Someone quietly excellent at their job may want exactly that and nothing more, and pushing them into a stretch reads as dissatisfaction with their current work. Ask directly, in a conversation that is not a performance review, and make declining genuinely acceptable. A stay interview is a good setting for it.

One warning about selection patterns. The person who says yes most readily is usually the one already carrying the most, and repeatedly stretching your strongest performer is how strong performers end up leaving. Spread these deliberately, including to people who are competent but not obviously your top performer, because that group has the most room to grow and is most often overlooked. The high potential employees guide covers identification beyond current output.

Scoping It Without Causing Damage

Six checks before you hand anything over. A stretch assignment that fails these does not produce a smaller amount of development, it produces a demoralized person and a business problem.

Is it real work with a real consequence?
SCOPED WELLSomething the business actually needs, where a poor outcome would matter and a good one would be noticed.
SCOPED BADLYAn exercise invented for their development. People detect this immediately and it teaches nothing except that you think they need practice.
Is the failure recoverable?
SCOPED WELLIf it goes badly, you lose time or a modest amount of money, and you can step in without a catastrophe.
SCOPED BADLYThe person's first stretch is your largest customer relationship. That is not development, that is gambling with someone else's confidence.
Does it require something they cannot currently do?
SCOPED WELLThere is a genuine gap between their current capability and what this needs. That gap is the entire point.
SCOPED BADLYIt is the same work they already do, in larger volume. That is not a stretch, it is a workload increase with a nicer name.
Is there a defined end?
SCOPED WELLA date, a deliverable, or a decision point. The person knows when they are finished and what finished looks like.
SCOPED BADLYAn open-ended new responsibility. Without an end, it is a permanent scope change nobody agreed to and nobody can decline.
Have you removed something else?
SCOPED WELLYou identified what they will stop doing, or accepted openly that something will slip while they do this.
SCOPED BADLYIt is added on top of a full workload. This is the single most common way stretch assignments turn into resentment and burnout.
Do they know it is a stretch?
SCOPED WELLYou said explicitly that this is beyond what they have done, that struggling is expected, and that asking for help is not failure.
SCOPED BADLYYou handed it over as if it were routine. Now they think a normal task is defeating them, which is much worse than knowing it is hard.

The fifth check is the one that gets skipped and causes the most harm. Adding a challenging new project on top of an already full workload is not a development opportunity, it is an unfunded mandate. The person will protect the visible new thing and absorb the overflow personally, and you will not find out until either the regular work fails or they do. Decide explicitly what will not get done, and say it out loud so nobody is guessing.

The Sentence That Prevents Most of the Damage
Say this when you hand it over: "This is beyond what you have done before, that is deliberate, and I expect parts of it to be hard. Asking me for help is part of the design, not a sign it is going badly." Without this, a capable person struggling with a genuinely difficult thing concludes that they are failing at something normal. That interpretation is far more damaging than the difficulty itself, and one sentence prevents it.

Supporting Without Taking It Back

The failure mode here is specific and common. The person struggles, you know how to do it, and you step in. Three weeks later you are doing the work with their name on it, and the development has not happened.

1
Agree the check-in cadence before it starts
Weekly for the first month, then fortnightly. Scheduled, so the person does not have to decide whether a problem is worth interrupting you for. That decision is where people get stuck silently.
2
Name who they can ask, beyond you
Someone outside the reporting line is often better, because asking a peer costs less socially than admitting difficulty to the person evaluating you.
3
Answer questions with questions first
What have you tried, what are the options, which would you choose. Give the answer if they are genuinely stuck, but not before they have reasoned through it, or you have replaced their thinking with yours.
4
Define what you will not do
Say explicitly which parts are theirs alone. Without this, support drifts into takeover incrementally and neither person notices until it has happened.
5
Let recoverable mistakes happen
This is the hardest part. If the consequence is a lost week rather than a lost customer, let it play out. Correcting every wrong turn produces someone who executes your judgment rather than developing their own.
6
Be visible about the ownership
Say in front of the team that this is theirs. It gives them authority they cannot generate for themselves, and it stops people routing around them to you.

The third step is where most managers struggle, particularly founders who are fast at the work. Answering a question directly takes thirty seconds and answering it with questions takes ten minutes. The ten-minute version is the entire point of the exercise. The workplace coaching guide covers the questioning technique in more depth.

Spotting Burnout Before It Happens

Stretch assignments produce burnout through a predictable route: capacity was not created, the person absorbed the difference personally, and the output looked acceptable until it suddenly did not. The signals arrive well before the failure.

They stop asking questionsEarly on they asked constantly. Now they do not. This usually means they have concluded that asking looks like failure, not that they have figured it out.
Their normal work is slippingThe stretch is consuming the capacity that used to go to their actual job. You either did not remove anything or you removed the wrong thing.
They are working evenings to keep upThe clearest signal and the easiest to miss, because the output still looks fine. It looks fine because they are paying for it with their own time.
Progress reports get vaguerSpecific updates become general reassurance. People do this when they are behind and hoping to catch up before anyone notices.
They have stopped mentioning itAt the start it came up in every conversation. Now it does not come up at all. Silence about a stretch is rarely a good sign.

The first signal is the most reliable and the most counterintuitive. A person who asked constantly in week one and asks nothing in week five has usually not become competent. They have concluded that asking is being read as struggling, and have decided to solve things alone regardless of cost. When you notice this, ask directly about workload rather than progress, because the answer to how is it going is almost always fine.

The intervention is straightforward once you see it: remove something else, extend the deadline, or reduce the scope. All three are acceptable and none of them is a failure. What is not acceptable is noticing and waiting to see whether they cope. The employee burnout guide covers the wider warning signs.

Companies Using FirstHR Onboard 3x Faster
Join hundreds of small businesses who transformed their new hire experience.
See It in Action

The Debrief That Makes It Count

Without a debrief, a stretch assignment is just a project that happened. The conversation at the end is where the experience turns into a capability the person can name, which is what makes it transferable to the next thing.

What can you do now that you could not do before?
Ask this first and let them answer it themselves. If they cannot name anything specific, either the assignment was not actually a stretch or the learning has not been consolidated, and both are worth knowing.
What was harder than you expected?
This surfaces the capability gap that actually mattered, which is frequently not the one you predicted when you scoped it. Useful for designing the next one.
Where did you get stuck, and what did you do?
How someone handles being stuck is the transferable skill. Whether the specific problem got solved matters far less than the method they developed for approaching problems they cannot immediately solve.
What would you do differently?
Their answer will be more accurate than yours, because they saw the parts you did not. It also establishes that reflection is expected rather than defensive.
What did I get wrong in how I set this up?
Ask it directly. Most people will not volunteer it. The answers improve the next assignment more than any amount of your own reflection will.
What do you want next?
This is the retention question. Someone who has just completed something difficult is at their most engaged and their most open about what they want. It is the best moment of the year to ask.

Do the debrief within a week of the end, while detail is still recoverable. Also make the outcome visible to the team, particularly when it went well, because a stretch assignment that nobody notices teaches everyone else that taking on hard things is invisible. The employee recognition guide covers doing this without it becoming performative.

The Stretch Assignment Template

A working document covering scoping, the handover conversation, check-ins, and the debrief. Copy or download it and use one per assignment.

Stretch Assignment Template
STRETCH ASSIGNMENT TEMPLATE

Employee:
Manager:
Start date:
End date:
PART 1: THE WORK

What is the assignment, in one sentence?
Why does the business need this done?
What does done look like? Be specific enough that both of you would agree it had happened.
If this goes badly, what is the worst realistic outcome?
Is that recoverable? yes / no
If no, this is the wrong assignment. Choose something else.
PART 2: THE CAPABILITY

What can this person not currently do that this will require?
Why this person? Answer all three.
Capacity: do they have room, or what will you remove?
Motivation: have they said they want more scope? When and in what words?
Gap: would you give this roughly even odds of going well? yes / no
If you are choosing this person mainly because they always say yes, stop and consider someone else.
PART 3: CREATING CAPACITY

What will they stop doing while this runs?
Who picks that up?
What will you accept slipping?
If nothing is being removed and nothing is allowed to slip, this assignment will be absorbed into their personal time. Go back and fix this before continuing.
PART 4: THE HANDOVER CONVERSATION

Cover all of these. Tick when said out loud.
This is beyond what you have done before, and that is deliberate
I expect parts of it to be hard
Asking for help is part of the design, not a sign of failure
Here is what you decide alone: _______
Here is what needs a conversation with me first: _______
Here is what I will not do: _______
Here is what happens when it finishes: _______
Date of conversation:
PART 5: SUPPORT STRUCTURE

Check-in cadence (weekly for month one, then fortnightly):
Standing check-in time:
Who else can they ask, besides me:
Budget or resources available:
PART 6: CHECK-IN LOG

At each check-in ask: what is getting in your way, and how many hours is this actually taking?
Date: Progress: Blockers: Hours per week:
Date: Progress: Blockers: Hours per week:
Date: Progress: Blockers: Hours per week:
Date: Progress: Blockers: Hours per week:
OVERLOAD WATCH
Tick any you observe, then act the same week.
They have stopped asking questions
Their regular work is slipping
They are working evenings to keep up
Progress updates have become vague
They have stopped mentioning the assignment
Action taken:
PART 7: DEBRIEF

Hold within one week of the end.
What can you do now that you could not do before?
What was harder than you expected?
Where did you get stuck, and what did you do?
What would you do differently?
What did I get wrong in how I set this up?
What do you want next?
PART 8: WHAT HAPPENS NOW

Did the responsibility become permanent? yes / no
If yes, what changes: title / scope / pay / nothing yet:
Was the outcome made visible to the team? yes / no
Next development step agreed:
Date to revisit:
Notes:

Part 3 is the one to be honest about. If you cannot name something that will be removed or allowed to slip, the assignment will be paid for out of the person's own time, and that is the version that ends badly regardless of how well everything else is designed.

When Not to Use a Stretch Assignment

They are not a universal tool, and using one in the wrong situation makes things worse rather than neutral.

SituationWhy a Stretch Assignment Fails HereWhat to Do Instead
The person is already overloadedThere is no capacity to create without something breakingFix the workload first. A stretch on top of overload is how you lose someone.
They are struggling in their current roleAdding difficulty to an existing difficulty compounds itAddress the current performance issue directly. Development comes after stability.
You need the work done well, right nowDevelopment requires tolerance for a worse outcome than an expert would produceDo it yourself or give it to whoever is best. Not everything can be a development opportunity.
It is really a permanent role changeFraming a promotion as an assignment avoids the conversation about title and payHave the actual conversation. Employees notice this framing and correctly read it as avoidance.
The person has said they do not want itDevelopment that is imposed produces compliance, not growthBelieve them. Ask again in six months. Not everyone wants an expanding role and that is legitimate.
You are hoping they fail so you can act on itThis is a performance decision wearing a development costumeManage the performance issue directly. This approach is transparent to everyone including them.

The fourth row deserves emphasis because it is the one that quietly destroys trust. When a stretch assignment becomes permanent additional responsibility with no acknowledgment, the employee reasonably concludes that development language was used to obtain extra work for free. Every subsequent offer will be read through that lens, by them and by anyone they talk to.

Common Mistakes

MistakeWhy It HappensThe Fix
Adding it on top of a full workloadThe new work is exciting and the existing work is invisibleName what gets removed or what will slip, before the assignment starts. This single step prevents most failures.
Not saying it is a stretchIt feels like it might undermine their confidenceThe opposite is true. Unnamed difficulty reads as personal inadequacy, which is far more damaging.
Taking it back when they struggleYou can do it faster and the struggle is uncomfortable to watchStruggle is the mechanism. Support with questions, and only step in when the consequence stops being recoverable.
Always choosing the same personThey say yes and they deliverYour most reliable person is the one most at risk of leaving from overload. Spread these deliberately.
No defined end pointIt started as a project and driftedSet a date and a deliverable at the start. Without an end, it becomes a permanent scope change nobody agreed to.
Skipping the debriefThe work is done and attention has moved onThe debrief is where the experience becomes a capability the person can name and reuse. Fifteen minutes within a week.
Treating a failed assignment as a verdict on the personThe outcome was visible and disappointingDebrief on which of the four causes applied: no capacity, gap too large, support missing, or objective unclear. Usually it is the scoping.
Making it invisibleAnnouncing it feels like unnecessary ceremonyIf nobody notices, everyone learns that taking on hard things goes unrecognized. Make the ownership and the outcome visible.

The thread through most of these is that a stretch assignment is a design problem, not a generosity problem. Offering someone a challenge is the easy part. Creating the capacity, naming the difficulty, holding back from rescuing, and debriefing properly are the parts that determine whether anything develops. The employee development guide covers how stretch assignments fit alongside the other levers.

The recurring work around this is keeping track of who has taken on what, what capability it built, and what was agreed about what comes next. FirstHR holds development plans, check-in records, and review history against the employee record, so the conversation about what someone was promised does not depend on anyone's memory of a hallway conversation eight months ago.

Key Takeaways
A stretch assignment is real work given deliberately beyond someone's current ability, so that completing it builds a capability. The difficulty is the mechanism, not a side effect.
It differs from delegation, which moves work to someone who can already do it, and from a stretch goal, which is an ambitious target against work they already perform.
Small businesses have more raw material for this than large ones. The vendor selection nobody owns and the process everyone complains about are development opportunities that already exist.
Choose on capacity, motivation, and a plausible gap. Missing any one of the three turns development into a problem, and motivation is the one most often assumed rather than asked about.
Remove something from their workload. Adding a stretch on top of a full plate is the single most common cause of failure, because the person absorbs the difference personally.
Say out loud that it is a stretch and that struggling is expected. Unnamed difficulty gets read as personal inadequacy, which does more damage than the difficulty itself.
Support with questions rather than answers, and define what you will not do, or support drifts into taking the work back and no development happens.
Watch for the person who stops asking questions. That usually means they have decided asking looks like failure, not that they have worked it out.
Debrief within a week on what they can now do that they could not before. Without it, a stretch assignment is just a project that happened.

Frequently Asked Questions

What is a stretch assignment?

A stretch assignment is a piece of real work given to an employee that sits deliberately beyond their current skills or experience, so that completing it builds a capability they did not have. It is genuine work the business needs rather than a training exercise, it has a defined scope and end point, and the person is expected to struggle with parts of it. The difficulty is the mechanism: the capability comes from working through the gap, not from being told about it.

What is an example of a stretch assignment?

Common examples include leading a project that requires two parts of the business to agree on something, owning a customer relationship end to end including the difficult conversations, redesigning a manual process with real authority to change it, running the weekly team meeting for a quarter, building and delivering training on something they know well, making the hiring recommendation for a role in their area, or covering a manager's responsibilities during a planned absence. The best examples at a small business are usually work that already exists and is currently done by whoever is most senior.

What is the difference between a stretch assignment and a stretch goal?

A stretch assignment is a piece of work that develops a capability the person does not currently have. A stretch goal is an ambitious performance target, usually a number, set above what is comfortably achievable. The assignment is about growth through new work; the goal is about effort against existing work. Asking a salesperson to hit 140 percent of quota is a stretch goal. Asking that same salesperson to design and run the onboarding for the next two hires is a stretch assignment.

How is a stretch assignment different from delegation?

Delegation moves work to someone who can already do it, usually to free up the manager's time. A stretch assignment moves work to someone who cannot yet do it, and the manager's time commitment often goes up rather than down because of the support required. If you hand over a task and expect it back done to standard with no involvement, that is delegation. If you expect to spend time unblocking, coaching, and reviewing, and the point is that the person becomes able to do something new, that is a stretch assignment.

How long should a stretch assignment last?

Long enough for real difficulty and short enough to have an end in sight, which in practice means about four weeks to six months. Shorter than a month rarely produces a genuine capability change. Longer than about six months and it stops being an assignment and becomes the person's job, which is fine if that is the intention but should then be recognized formally with a title or compensation change. Every stretch assignment needs a defined end point, even if the outcome is that the responsibility becomes permanent.

How do you choose who gets a stretch assignment?

Look for three things together: capacity, motivation, and a plausible gap. Capacity means they have room, or you can create room by removing something. Motivation means they have indicated they want more, which you find out by asking rather than assuming. A plausible gap means the assignment is beyond them but not absurdly so; roughly the level where you would give it a fifty to seventy percent chance of going well. Do not default to your strongest performer every time, because that is how strong performers end up carrying everything and leaving.

Can a stretch assignment cause burnout?

Yes, and the most common cause is adding it on top of a full workload without removing anything. The assignment is new and visible, so the person protects it by absorbing the overflow into evenings and weekends, and the output looks fine right up until it does not. Warning signs include a person who stops asking questions, whose regular work starts slipping, whose progress updates become vague, or who has simply stopped mentioning the assignment. Removing something else at the start prevents most of this.

Should stretch assignments come with more pay?

Not usually while the assignment is running, because it is development rather than a permanent role change and it has a defined end. What should happen is a conversation about what comes next before it starts, so the person knows whether success leads to a title, a permanent scope change, a pay review, or simply the capability itself. The version that damages trust is a stretch assignment that becomes permanent additional responsibility with no acknowledgment, which employees reasonably read as extra work obtained for free.

What if the stretch assignment fails?

Treat it as information about the scoping rather than a verdict on the person, at least the first time. Failed stretch assignments usually trace back to one of four causes: no capacity was created, the gap was too large, the support was not there, or the objective was never clear. Debrief specifically on which of those applied. A person who takes on a hard thing and does not fully succeed has still learned more than one who was never asked, and how you handle the shortfall determines whether anyone volunteers next time.

Do stretch assignments work at a small business?

They work better at a small business than at a large one, because the work is already there. At a fifteen-person company there is a constant supply of things that need doing and no obvious owner: a process that needs redesigning, a customer relationship nobody has time for, training that has never been written. A large company has to construct developmental experiences deliberately. A small business has more of them than it can staff, which turns a resourcing problem into a development opportunity.

Ready to transform your onboarding?

7-day free trial No credit card required
Start Your Free Trial